STEELFAB

SteelFab-2.JPG
 

STRUCTURAL PROJECT

Our team constructed a 10,000 sqf addition to the existing space. The job required anchor bolts to be precisely placed along with walls for infill slab and structural beams.

 
 
 

(704) 503-9553

Flowe Construction

110 Hough Street
Charlotte, NC 28214

©2020 by Flowe Construction. Proudly created with Wix.com